| Power Plant | Guaranteed Cold Start-Up Time [h] | φ | 1 - φ | Marginal Costs pimc [?MWh] | Offer Price pi [?MW] | |
| p0 = 10 | p0 = 70 | |||||
| Wind turbine | ∞ | 0.000 | 1.000 | 1 | 11 | 71 |
| Hydroelectric power station | 0.02 | 0.980 | 0.020 | 1 | 1 | 2 |
| Gas turbine | 0.12 | 0.893 | 0.107 | 90 | 91 | 98 |
| Cogeneration plant (CHP) | 0.17 | 0.855 | 0.145 | 50 | 51 | 60 |
| Combined cycle gas turbine | 5 | 0.167 | 0.833 | 50 | 58 | 108 |
| Hard coal power plant | 6 | 0.143 | 0.857 | 60 | 69 | 120 |
| Lignite power plant | 9 | 0.100 | 0.900 | 40 | 49 | 103 |
| Nuclear power plant | 50 | 0.020 | 0.980 | 5 | 15 | 74 |