|   Pumping well No.  |       Pumping well Name  |       Discharge rate Q (m3/day)  |       Drawdown S (m)  |       Specific Capacity Sc (m2/day)  |    
|   P.W-1  |       Ellinjagh-2  |       388.8  |       24.19  |       16.07  |    
|   P.W-2  |       Shekhan  |       712.8  |       12.58  |       56.66  |    
|   P.W-3  |       Dolaza  |       479.5  |       6.57  |       72.98  |    
|   P.W-4  |       Aliawa Girdashina  |       648  |       16  |       40.50  |