River | Start Time (Day) | Stop Time (Day) | River Stage (m) a.s.l | Riverbed Bottom (m) a.s.l | Riverbed Thickness (m) | Riverbed Kz (m/s) | Width of River (m) |
Lesser Zab | 0 | 7300 | 200 | 180 | 83 | 1e−5 | 220 |