| Load Combination No. | Load A (kN) | Load B (kN) | Load C (kN) |
| 1. | 100 | 100 | 100 |
| 2. | 100 | 100 | 120 |
| 3. | 100 | 100 | 150 |
| 4. | 100 | 120 | 100 |
| 5. | 100 | 120 | 120 |
| 6. | 100 | 120 | 150 |
| 7. | 100 | 150 | 100 |
| 8. | 100 | 150 | 120 |
| 9. | 100 | 150 | 150 |
| 10. | 120 | 100 | 100 |
| 11. | 120 | 100 | 120 |
| 12. | 120 | 100 | 150 |
| 13. | 120 | 120 | 100 |
| 14. | 120 | 120 | 120 |
| 15. | 120 | 120 | 150 |
| 16. | 120 | 150 | 100 |
| 17. | 120 | 150 | 120 |
| 18. | 120 | 150 | 150 |
| 19. | 150 | 100 | 100 |
| 20. | 150 | 100 | 120 |
| 21. | 150 | 100 | 150 |
| 22. | 150 | 120 | 100 |
| 23. | 150 | 120 | 120 |
| 24. | 150 | 120 | 150 |
| 25. | 150 | 150 | 100 |
| 26. | 150 | 150 | 120 |
| 27. | 150 | 150 | 150 |