Standards

Criteria

Restricted Criteria (Buffer Zone)

Environmental

Ground water

>200 m

Distance from wells

>25 km

Social and economic

Distance from airports

>9.5 km

Distance between landfill and the center of waste generation

The maximum distance is 50 Km or maximum time taken per trip for assembly vehicles 30 - 45 min

Property boundary

>500 m

Distance from primary highways

>500 m

Geological and geomorphological

Soil

Soil should have low permeability

Slope

5% is perfect