| Standards |
Criteria |
Restricted Criteria (Buffer Zone) |
| Environmental |
Ground water |
>200 m |
| Distance from wells |
>25 km |
|
| Social and economic |
Distance from airports |
>9.5 km |
| Distance between landfill and the center of waste generation |
The maximum distance is 50 Km or maximum time taken per trip for assembly vehicles 30 - 45 min |
|
| Property boundary |
>500 m |
|
| Distance from primary highways |
>500 m |
|
| Geological and geomorphological |
Soil |
Soil should have low permeability |
| Slope |
5% is perfect |