Standards | Criteria | Restricted Criteria (Buffer Zone) |
Environmental | Ground water | >200 m |
Distance from wells | >25 km | |
Social and economic | Distance from airports | >9.5 km |
Distance between landfill and the center of waste generation | The maximum distance is 50 Km or maximum time taken per trip for assembly vehicles 30 - 45 min | |
Property boundary | >500 m | |
Distance from primary highways | >500 m | |
Geological and geomorphological | Soil | Soil should have low permeability |
Slope | 5% is perfect |