RESERV-OIR | Top depth (m) | Bottom depth (m) | Thickness (m) | Lithology | Porosity | Sw = (R0/Rt) | Sh(1 − Sw) |
R1 | 2466.0 | 2484.0 | 18.0 | sand | 0.12 | 0.2 | 0.8 |
R2 | 2506.0 | 2524.0 | 18.0 | sand | 0.12 | 0.3 | 0.7 |