Influence level

Subsidence depth (D)

Mined-out area

Total

Light

D ≤ 0.5 m

677.63 hm2

2224.25 hm2

Severe

0.5 m < D ≤ 1.5 m

311.59 hm2

More severe

D ≥ 1.5 m

1235.03 hm2