| Content of Sponge City Construction |
Investment cost (10,000 RMB/y) |
Maintenance cost (10,000 RMB/y) |
||
| Conventional model |
Sponge city model |
Conventional model |
Sponge city model |
|
| Total |
21,860 |
18,426 |
876 |
831 |
| 1) Construction and operation maintenance in residential area |
3960 |
5576 |
96 |
144 |
| a) Roof greening |
0 |
200 |
0 |
18 |
| b) Pavement (hard/ permeable) |
1440 |
2160 |
15 |
30 |
| c) Green space (traditional/ecological) |
2160 |
2520 |
65 |
72 |
| d) Green belt (traditional/grass planting ditch) |
360 |
396 |
16 |
18 |
| e) Rainwater storage device |
0 |
300 |
0 |
6 |
| 2) Construction and maintenance of rainwater pipe network and pump station |
6500 |
3900 |
360 |
340 |
| 3) Watercourse ecological construction and maintenance |
5100 |
4500 |
270 |
250 |
| 4) Construction and operational maintenance of wastewater pipeline and wastewater treatment plant |
4500 |
3250 |
141 |
91 |
| 5) Construction and operational maintenance of waterlogging prevention facility |
1800 |
1200 |
9 |
6 |