| New Methodology DT Evaluation depend on Power Link | |||
| Evaluation Rate/St. | Ascending | Stable | Descending |
| P | 98.2 | 99.9 | 64.3 |
| Re | 89.4 | 99.7 | 92.1 |
| F-measure | 93.6 | 99.8 | 75.7 |