Variable

Parameter Estimates

Growth

0.294***

[0.000]

Liquidity

−0.052

[0.325]

Leverage

1.188***

[0.000]

Lease Cost

1.277

[0.158]

Tangibility

−0.078***

[0.000]

Fuel Cost

−17.155

[0.088]

Personnel Cost

14.914

[0.83]

Constant

−1.765

[0.567]

R2

0.836

Adjusted R2

0.698