| Particulars | Combine (T3) | Simulation |
| Field size, length × width | 50 × 40 | 50 × 40 |
| Area, ha | 0.2 | 0.2 |
| Working width, m | 1.45 | 1.45 |
| Working speed, m∙s−1 | 1.20 | 1.20 |
| Theoretical field capacity, ha∙h−1 | 0.64 | 0.64 |
| Total working time, min | 31.36 | 48.58 |
| Field capacity at plot, ha∙h−1 | 0.38 | 0.25 |
| Field efficiency, % | 60.12 | 38.79 |
| Coverage, ha∙yr−1 | 78.06 | 50.37 |
| Number of operators, man | 1 | 1 |
| Number of auxiliary operators, man | 1 | 1 |
| Labor requirement per unit area, man-h∙ha−1 | 6.37 | 9.87 |