Contrasts

Contrasts estimates

NN

NP

NSE

MTS

Yield

C1 =

Control vs The remaining =

−143.62*

−232.42*

−13.87*

−98.53*

−7815.02*

C2 =

200 kg∙ha−1 N vs The remaining =

−97.04NS

−62.96NS

−8.96*

−21.98*

−2715.62NS

C3 =

TIS1 vs TIS2 =

−29.78*

−25.67*

−0.63*

15.18NS

93.75NS

C4 =

Tradicional (ITS1) vs LT (ITS1) =

−4.58*

−11.68NS

−3.86NS

13.98*

721.33*

C5 =

LT [0 days (ITS1) vs 5 and 10 days (ITS1)] =

−13.87NS

1.76NS

−3.58NS

0.78NS

250.84NS

C6 =

LT [5 days (ITS1) vs 10 days (ITS1)] =

2.90*

−5.52NS

0.10*

−0.12NS

−296.50NS

C7 =

Traditional (ITS2) vs LT (ITS2) =

−27.81*

−19.18NS

−4.22NS

8.65NS

482.41NS

C8 =

LT [days (ITS2) vs 5 and 10 days (ITS2)] =

−7.91*

−5.56NS

1.83*

2.37NS

−356.59NS

C9 =

LT [5 days (ITS2) vs 10 days (ITS2)] =

17.45*

18.85NS

2.53NS

4.34NS

−121.24NS