CastMELT Material Optimization Savings** | ||||||||||||||
FeSi | Graphite | HC FeMn | Mc FeMn | HC FeCr | Mins | Total Savings | ||||||||
1 | 105171212 (NFL) | 1605 | 3 | * | 3 | 25 | * | 1636 | 1508 | 350 | 175 | |||
CastMELT | 1605 | 0.88 | 14.206 | 1620 | 1508 | 350 | 152 | 6415.4 | ||||||
Material Savings | 2.12 | 3 | 10.794 | 16 | ||||||||||
Savings on Production Cost (N) | 1007 | 1134 | 4274 | |||||||||||
2 | 105171211 (NFL) | 1980 | * | * | 10 | 80 | * | 2070 | 1508 | 300 - 350 | 260 | |||
CastMELT | 1980 | * | * | * | 77 | * | 2057 | 1508 | 300 - 350 | 227 | 4806 | |||
Material Savings | 10 | 3 | 13 | |||||||||||
Savings on Production Cost (N) | 3780 | 1026 | ||||||||||||
3 | 10517611 (NFL) | 802 | 7.5 | * | 10.5 | * | * | 820 | 1580 | 150 | 200 | |||
CastMELT | 802 | 6 | * | * | 7.2 | * | 815.2 | 1580 | 150 | 185 | 1611 | |||
Material Savings | 1.5 | 10.5 | −7.2 | 4.8 | ||||||||||
Savings on Production Cost (N) | 594 | 1017 | ||||||||||||
4 | 8517611 (NFL) | 1000 | 5 | * | * | * | 10 | 1015 | 1520 | 300 | 120 | |||
CastMELT | 1000 | 5.34 | * | * | * | * | 1005.34 | 1520 | 300 | 111.69 | 3286 | |||
Material Savings | −0.34 | 10 | ||||||||||||
Savings on Production Cost (N) | −134.4 | 3420 | ||||||||||||
5 | 185171221 (NFL) | 2875 | 15 | * | * | 50 | * | 2940 | 1575 | 450 | 230 | |||
CastMELT | 2875 | 17.8 | * | * | 18 | * | 2911 | 1575 | 450 | 220 | ||||
Material Savings | −2.8 | 32 | 9886 | |||||||||||
Savings on Production Cost (N) | 1108 | 10944 | ||||||||||||
6 | 95171221 (NFL) | 2050 | 14 | * | 30 | * | * | 2094 | 1580 | 300 - 350 | 237 | |||