| Project | Parameter | Project | Parameter |
| Forward power | 1400 W | Nebulizer | Meinhard |
| Sampling depth | 150 step | Nebulizer temp | 3˚C |
| Nebulizer gas | 0.85 L/min | Pump speed | 30 r/min |
| Auxiliary gas | 0.80 L/min | Survey | Peak jump |
| Cooling gas | 13.0 L/min | Channels | 3 |
| Oxide | <0.5% | Dwell time | 10 ms |
| ICP&MS connector | Xt | Main runs | 2 |
| Internal standard | 103Rh-10 ppb | Sweeping times | >100/run |