Batch | Concrete type | Mix design ratio | W/c ratio | Slump |
1 | Control specimen | 1:2:4 | 0.5 | 30 mm |
2 | 10% Cement replacement with FA & addition of CFRP | 1:2:4 | 0.5 | 15 mm |
3 | 10% Cement replacement with FA & addition of CFRP + GFRP | 1:2:4 | 0.5 | 10 mm |
4 | 10% Cement replacement with FA & addition of CFRP + GFRP + SSF | 1:2:4 | 0.5 | 5 mm |