1st Operation

2nd Operation

3rd Operation

Due Date

Job 1

7 (M1)

8 (M3)

10 (M2)

26

Job 2

6 (M3)

4 (M1)

12 (M2)

26

Job 3

8 (M2)

8 (M1)

7 (M3)

27