Factor | Variable | Loading factor |
Factor 1: Legal implications variance explained = 30.271% Eigenvalue = 22.703 Cronbach’s Alpha = 0.933 N = 15 | Data security | 0.759 |
Processes and responsibilities | 0.743 | |
Professional liability | 0.731 | |
Legislation and judicial precedence | 0.695 | |
Data interoperability | 0.694 | |
Sharing of copyright data | 0.691 | |
Intellectual Property Rights | 0.672 | |
Cost compensation | 0.663 | |
Standard of care and professional negligence | 0.660 | |
Admissibility of electronic-based document | 0.654 | |
Lack of BIM standards | 0.632 | |
Model management | 0.632 | |
legal validation of design (NCC submissions) | 0.582 | |
Condition of contracts (e.g. FIDIC) | 0.532 | |
It is necessary to have contractual guidelines to guide in BIM adoption | 0.448 | |
Factor 2: Awareness and knowledge variance explained = 6.168% Eigen value = 4.626 Cronbach’s Alpha = 0.939 N = 16 | BIM makes dispute resolution easier | 0.736 |
BIM improved good working relationship | 0.724 | |
BIM helps to reduce variations | 0.701 | |
BIM improves quality | 0.687 | |
BIM improves decision management process | 0.686 | |
BIM improves communication in the construction team | 0.680 | |
BIM facilitates positive ROI | 0.663 | |
BIM helps to reduce claims | 0.654 | |
BIM reduces cost of a project | 0.646 | |
BIM aids in early problem detection | 0.626 | |
BIM makes real time correction of information easy at any stage of a project | 0.620 | |
BIM facilitates effective coordination | 0.615 | |
BIM reduces cost of operation and maintenance of a facility | 0.592 | |
BIM enables the construction Team to work together effectively and efficiently | 0.584 | |
BIM enables faster execution of a project hence saving time | 0.560 | |
BIM aids in clash detection of construction element as designed by different professionals | 0.520 |