Concrete grade | Concrete type | Cost (yuan/m3) | Spread (yuan/m3) | |
Sand saving cost | Increased cost of water reducer | |||
C30 | Ordinary pumping class | (226.5 × 20)/1000 = 4.53 | 335 × 2 × 0.2% = 1.34 | 3.19 |
C20 | Ordinary pumping class | (238.5 × 20)/1000 = 4.77 | 275 × 2 × 0.15% = 0.83 | 3.94 |
C25 | Ordinary pumping class | (232.5 × 20)/1000 = 4.65 | 305 × 2 × 0.15% = 0.92 | 3.73 |
C30 | Low slump non-pumping class | (375 × 20)/1000 = 7.5 | 310 × 2 × 0.1% = 0.62 | 6.88 |
C30 | Ordinary pavement | (340 × 20)/1000 = 6.8 | 310 × 2 × 0.1% = 0.62 | 6.18 |