S.V | d.f | SS | MS | Expected mean square | f-ratio |
A | 2 | 144.9638 | 72.4819 | a∑iNiA2ia−1+7.7153σ2AC+1.2531σ2ABC+σ2e | 0.7373 |
B | 2 | 101.0706 | 50.5353 | b∑jNjB2jb−1+6.8274σ2BC+1.2531σ2ABC+σ2e | 0.9649 |
C | 3 | 201.1734 | 67.0578 | 26.963σ2C+1.7325σ2AC+2.2840σ2BC+0.8354σ2ABC+σ2e | 1.4645 |
AB | 4 | 213.6512 | 53.4128 | ab∑ijnij.E(AB)2ij(a−1)(b−1)+8.6482σ2ABC+σ2e | 0.2757 |
AC | 6 | 152.5572 | 86.2273 | 11.2040σ2AC+0.4177σ2ABC+σ2e | 1 |
BC | 6 | 517.3638 | 25.3261 | 0.4177σ2BC+67.3453σ2ABC+σ2e | 1 |
ABC | 12 | 2324.8692 | 193.7391 | 4.8323σ2ABC+σ2e | 99.4911 |
Error | 54 | 87.6285 | 1.9473 | σ2e |
|
Total | 80 |
|
|
|
|