Type | A | B | C | Total available Hs. |
General Labor | 10 Hs. | 4 Hs. | 5 Hs. | 900 or 1000 or 1100 |
Technical Time | 5 Hs. | 7 Hs. | 2 Hs. | 1000 or 1450 or 1600 or 2000 |
Packing Time | 1 H. | 2 Hs. | 3 Hs. | 300 or 400 |
Profit | 130 | 100 | 80 |
|
# Wash. Mach. |
|
|
|
|