Source | Domain | C1) Specification | C2) Test Selection Criteria | C3) Execution and Feedback Manipulation | C4) Feedback integration | C5) Test type, Implementation, Observability and Level |
[81] -[83] | Production automation | UML (structure: system and context; interaction, mainly state charts: generation of specific test cases) | Depending on diagram, extraction of sequences from interaction diagrams (transition parameter variation, path coverage) | Offline | As spec. | IEC 61499 |
[84] | Production automation | UML state charts | Model transformation, path unfolding, path coverage | Offline | As spec. | n.a. |
[85] | Production automation | UML sequence diagram | Only the specified scenario | Offline | Both SiL and HiL possible | IEC 61131-3, unit |