Tests

ADF

PP

KPSS

decision

Variables

t-statistic

Critical value (5%)

t-statistic

Critical value (5%)

t-statistic

Critical value (5%)

Production cv

−6.316707

−2.976263

−15.76611

−2.971853

0.351101

0.463000

I (1)

Pluvio in ht

−4.007977

−2.967767

−3.907654

−2.967776

0.138113

0.463000

I (0)

Superficie

−5.609843

−2.971853

−5.774175

−2.971853

0.260434

0.463000

I (1)