Sl. No.

Actual/Effective field capacity (ha/h)

Degree of weeding/weeding efficiency (%)

Plant damage (%)

Walking speed (k/h)

Operation in Jogitola, Gazipur

01

0.020

82.55

1.64

1.52

02

0.019

82.23

1.57

1.58

03

0.017

82.41

2.30

1.53

04

0.022

80.26

3.03

1.56

05

0.021

80.96

1.46

1.48

Average

0.0198

81.68

2

1.53

Operation in BRRI research field, Gazipur

01

0.021

81.15

1.57

1.58

02

0.020

79.65

1.83

1.55

03

0.021

85.21

2.45

1.57

04

0.020

81.96

2.15

1.61

05

0.022

82.82

3.16

1.59

Average

0.0208

82.16

2.23

1.58