| Name | Discretion |
| FN0 | Frame number of the first measurable signal |
| FNI | Frame number of the initial maximum signal |
| FNG | Frame number of the global maximum signal |
| FNM | Frame number of the final maximum signal |
| FNT | Frame number of the last measurable signal |
| FS0 | The signal from the first measurable frame |
| FSI | The frame signal of the initial maximum |
| FSG | The frame signal of the global maximum |
| FSM | The frame signal of the final maximum |
| FST | The frame signal of the total maximum |
| FSP | Peak signal |
| ST | Total Integrated Signal |
| SI | Integrated Signal to the Initial maximum |
| SM | Integrated Signal to the final maximum plus the first frame after FSG |
| SR | Integrated signal from the second frame after FSG to FST |
| MES | Mean equilibrium signal |
| SQI | Signal quality index |