Name | Discretion |
FN0 | Frame number of the first measurable signal |
FNI | Frame number of the initial maximum signal |
FNG | Frame number of the global maximum signal |
FNM | Frame number of the final maximum signal |
FNT | Frame number of the last measurable signal |
FS0 | The signal from the first measurable frame |
FSI | The frame signal of the initial maximum |
FSG | The frame signal of the global maximum |
FSM | The frame signal of the final maximum |
FST | The frame signal of the total maximum |
FSP | Peak signal |
ST | Total Integrated Signal |
SI | Integrated Signal to the Initial maximum |
SM | Integrated Signal to the final maximum plus the first frame after FSG |
SR | Integrated signal from the second frame after FSG to FST |
MES | Mean equilibrium signal |
SQI | Signal quality index |