| Project characteristics | Option 1 |
| Net head (m) | 147.600 |
| Design flow (m3/s) | 35.000 |
| Design time of operation (%) | 100.000 |
| Power production (kW) | 48,144.537 |
| Energy production (kWh/year) | 210,873,072,060.000 |
| Energy revenue (EUR/year) | 22,795,379,090.000 |
| Emission reduction (tCO2/year-Coal) | 126,523,843.000 |
| Emission reduction (tCO2/year-Gas) | 42,174.614 |
| Emission reduction (tCO2/year-Fuel) | 67,479.383 |
| Carbon market (EUR/year)-Mean | 787,259.467 |
| Investment cost (EUR) | 49,625,200.139 |
| Investment cost /kW (EUR/kW) | 1030.755 |
| Investment cost/kWh (EUR/kWh) | 0.235 |
| O & M Cost (EUR/year) | 595,502.402 |
| NVP: Net Present Value (EUR) | 606,777,525.321 |
| IRR: Internal Rate of Return (%) | 46.000 |
| Payback period (Years) | 2.235 |
| Amortization plan (Yearly) | 1,787,867.910 |
| Suggested turbine type | Pelton/Turgo |
| Exchange rate (31.12.2015), 1 EUR | 1.000000 EUR |