Design Case

Construction cost

(L∙E/m2)

Repair cost

(L∙E/m2)

Base Shear (t)

Resistance

Life cycle cost

(L∙E/m2)

Construction Cost Ratio

Case 1 (D + L)

883.46

426.6

184.87

1310.05

1

(The reference value)

Case 2 (R = 5)

950.14

391.87

246.25

1342

1.0755

Case 3 (R = 1)

1313.37

277.8

431.29

1591.14

1.487

Case 4 (ESEE)

988.55

377

246.58

1356.53

1.12