Item

Volume

(m3)

Contractor fees (Pounds)

Material cost

(Pounds)

Supervision percentage (%)

Losses percentage (%)

Plain Concrete

33.34

130

690

10

3

Reinforced Concrete

329.05

330

690

10

3