Location

Coordinates

Discontinuity Type

Representative Orientation

Average Value

Easting

Northing

Dip Direction

Dip

Spacing (cm)

Persistence (m)

Jr

Ja

Jw

SRF

Tunnel Intake

295,401

3,865,172

Foliation

84

56

12

3.5

1

4

1

2.5

J-1

286

65

27

2.7

1.5

3

J-2

234

60

10

1.8

1

3.5

Near Nullah Tunnel Intake

295,453

3,865,150

Foliation

81

39

14

2.94

2

3

1

2

J-1

256

63

15.56

1.3

2

2

J-2

343

76

38

2

1.5

3

Along Nullah Downstream Intake Structure

295,545

3,865,143

Foliation

69

58

15

3.1

2

2

1

2

J-1

307

54

2.7

0.9

2

2

J-2

234

56

1.9

2.5

2

3

Along Tunnel In Shear Zone

295,724

3,865,185

Foliation

347

77

5.8

6

1

4

1

5.5

J-1

70

50

8.2

0.77

1

3

J-2

210

42

8.6

0.53

1

4

Tunnel Alignment

296,910

3,863,742

Foliation

249

61

10

8

1.5

3

1

2.5

J-1

57

58

4.5

0.5

1.5

3

J-2

142

56

2

1.5

1

4

Along Tunnel

297,307

3,863,476

Foliation

258

77

12.6

18.09

3

2

1

2.5

J-1

111

21

15.69

3.38

3

3

J-2

163

83

50.9

9.07

2

2

Near Tunnel Outlet

297,365

3,863,256

Foliation

253

60

9.1

8

1

3

1

2.5

J-1

131

59

2.6

1.5

1

3

J-2

354

57

0.4

0.9

1.5

4

Tunnel Outlet

297,579

3,863,291

Foliation

264

87

11.28

2.5

3

2

1

2

J-1

190

87

25.4

1.4

3

2

Along the Nullah Downstream

297,962

3,863,277

Foliation

77

78

64.5

18.6

2

3

1

2

J-1

207

73

40.28

12.95

3

3

J-2

47

33

123.5

6.15

2

2

Along Road Near Bridge

297,952

3,863,038

Foliation

227

73

17.18

2.04

2

4

1

2.5

J-1

213

39

25.12

1.41

1

3

J-2

350

74

19.18

1.45

2

3