Fuel Type | Running Power Plants | Plant Under Construction | |||||
| Power Stations | Capacity (MW) | Ref. | Power Stations | Capacity (MW) | Expected Operations | Ref. |
Coal Fired | Barapukuria | 525 | [8] | Matarbari | 1200 | 2024 [8] | [9] |
Payra Thermal | 1320 | 1st unit in August, 2019 [10] | [11] | ||||
Rampal | 1320 |
| [11] | ||||
Oil & Gas Fired | Ashuganj | 1627 | [12] [13] | Feni Lanka Power Limited | 114 | September, 2019 |
|
Ghorasal | 950 | [14] | |||||
Shikalbaha | 150 |
| Manikganj Power Generations Limited | 162 | January, 2020 |
| |
Siddhirganj | 260 |
| |||||
Orion Group | 4*100 |
| Bhairob Power Limited | 55 | January, 2020 |
| |
Lakdhanavi Bangla | 52.2 |
| |||||
Desh Energy Chandpur | 200 |
| Payra LNG Power Plant | 3600 | 1st phase-December, 2022 2nd phase-December, 2023 | [11] | |
Doreen Power Generations | 165 |
| |||||
Gas Turbine | Meghnaghat | 450 | [15] |
|
|
|
|
Ashuganj | 146 | [13] | |||||
Haripur | 360 |
| |||||
Golpara | 265 |
| |||||
Mymensingh | 210 |
| |||||
Siddhirganj | 240 |
| |||||
Gas Engines | Baraka Power Ltd. | 51 | [16] |
|
|
|
|
Dhaka | 7 |
| |||||
Gazipur | 53 |
| |||||
Gopalganj | 100 |
| |||||
Maona | 35 |
| |||||
Raozan | 240 |
| |||||
Ghorashal Regent | 108 |
| |||||
Baghabari | 50 |
| |||||
Hydroelectric | Karnafuli | 230 | [17] |
|
|
|
|