Fuel Type

Running Power Plants

Plant Under Construction

Power Stations

Capacity

(MW)

Ref.

Power Stations

Capacity

(MW)

Expected Operations

Ref.

Coal Fired

Barapukuria

525

[8]

Matarbari

1200

2024 [8]

[9]

Payra Thermal

1320

1st unit in August, 2019 [10]

[11]

Rampal

1320

[11]

Oil & Gas Fired

Ashuganj

1627

[12] [13]

Feni Lanka Power Limited

114

September, 2019

Ghorasal

950

[14]

Shikalbaha

150

Manikganj Power Generations Limited

162

January, 2020

Siddhirganj

260

Orion Group

4*100

Bhairob Power Limited

55

January, 2020

Lakdhanavi Bangla

52.2

Desh Energy Chandpur

200

Payra LNG Power Plant

3600

1st phase-December, 2022

2nd phase-December, 2023

[11]

Doreen Power Generations

165

Gas Turbine

Meghnaghat

450

[15]

Ashuganj

146

[13]

Haripur

360

Golpara

265

Mymensingh

210

Siddhirganj

240

Gas Engines

Baraka Power Ltd.

51

[16]

Dhaka

7

Gazipur

53

Gopalganj

100

Maona

35

Raozan

240

Ghorashal Regent

108

Baghabari

50

Hydroelectric

Karnafuli

230

[17]