Alternatives | Criteria | |||||||||
Short description | Costs | Technical complexity solution | Social impact | Time for implementation | Environmental impact | Impact on irrigated area | Cooperation with India | |||
Hydraulic measures | Q1 | Raising embankments | +++ | ++ | −−− | +++ | +++ | +++ | − | |
Q2 | Sleeper dikes | + | +++ | ++ | ++ | −− | − | +++ | ||
Q3 | Use of old Koshi channel | −− | ++ | − | − | − | − | −− | ||
Q4 | Flood storage | − | + | + | − | − | + | ++ | ||
Q5 | Koshi High Dam | −−− | −− | ++ | −−− | −− | −−− | +/− | ||
Sediment control measures | S1 | Reduction of upstream sediment supply | −−− | +++ | − | −−− | + | − | +++ | |
S2 | Koshi High Dam | −−− | −− | +++ | −−− | −−− | − | −−− | ||
S3 | Narrowing of river by permanent structures | −− | +++ | − | −− | +++ | +/− | −− | ||
S4 | Narrowing of river by recurrent measures | +/− | ++ | +/− | ++ | +++ | ++ | − | ||
S5 | Dredging | −−− | + | − | + | ++ | − | −− | ||
S6 | Controlled flooding and sedimentation using old course | −− | − | ++ | − | −− | − | −− | ||
S7 | Controlled flooding, with deposition areas | −− | −− | −−− | −− | −− | −− | ++ | ||
S8 | Removing embankments and Koshi barrage | −− | + | + | −− | −−− | −−− | −− |