| Cyclic irrigation site | Control site | ||
| T-N | T-P | T-N | T-P |
Land Preparation Period | −0.95 | −0.19 | 0.48 | 0.24 |
(STD) | (0.53) | (0.15) | (0.49) | (0.48) |
Normal Irrigation Period | −0.46 | (−0.08) | 0.18 | 0.00 |
(STD) | (0.28) | (0.06) | (0.33) | (0.27) |