Cyclic irrigation site

Control site

T-N

T-P

T-N

T-P

Land Preparation Period

−0.95

−0.19

0.48

0.24

(STD)

(0.53)

(0.15)

(0.49)

(0.48)

Normal Irrigation Period

−0.46

(−0.08)

0.18

0.00

(STD)

(0.28)

(0.06)

(0.33)

(0.27)