Period

Date

Control site

Cyclic irrigation site

Land preparation

5/3

5/3

Puddling

5/5

5/5

Transplanting

5/10

5/8

(Mid−summer drainage)

(6/25 - 7/9)

(6/30 - 7/12)

Heading time

7/20

8/1

Additional fertilizer

7/28

7/14

Harvest

9/5

9/6