Yes

No

1

9

1. Site sustainability

30 Points-15%

Y

Pre required

Construction activity pollution prevention

Site Selection

1

1. Site selection on previously developed lands or grey fields available lands within urban areas.

1

1

2. That the construction site is not agricultural land, or classified as a nature reserve, or unexploited land Previously are located within a range in river or rain floods, or less than 15 meters from Bodies of water and less than 30 m from the Wetlands.

1

1

3. Availability of basic services and public transportation within 800 m.

1

1

4. Select site considered polluted (Brownfield) and coordinating the development plan with the activities to address the site environment and utilizing existing infrastructure during the implementation of the plan.

1

Building Accessibility

1

5. Parking provide

1

1

6. Provide a paved road to reach from the main road to the car park via building entrance with a width not less than 1.2 m.

1

1

7. Door width shall not be less than 0.8 m, and the height of the door handle shall not exceed 1.2 - 0.85 m.

1

Site Development

1

8.Cultivate at least 10% of the site’s area and preserve as much as possible the existing trees or cultivate native plants.

1

1

9. Maintaining open spaces on the site such as parks and beaches or increasing the area of open spaces through site design.

1

1

10. Employing plants on site in a manner reduces the energy needed for heating and cooling inside the building and using alternative energy sources such as photovoltaic cells to meet the electricity needs on the site, especially lighting.

1

1

11. Reduce dependence on potable water to irrigate plants on site and replace with reclaimed gray water.

1

1

12. Reducing soil erosion.

1

Outdoor Thermal Comfort Strategy

2

13. Use design strategies such as proper orientation, shading, ventilation, and bulk storage (use at least two of these strategies).

2

2

14. Using high reflection coefficient materials.

2

Urban Heat Island Effect

1

15. Use shading devices

1

1

16. Using green roofs is not less than 50% of the project area.

1

2

17. Using high reflection coefficient materials.

2