Topographical position

Rainfall event of 16 October 2010: All

Dongas in land use areas with 25 mm of rainfall and W National Park with 17 mm of rainfaill

Rainfall event of 2 October 2010

W National Park Dongas (DP1 & DP2)

With 45 mm of rainfall

Rainfall event of 6 October 2010

W National Park Dongas (DP1 & DP2)

With 21 mm of rainfall

Rainfall event of 11 October 2010

W National Park Dongas (DP1 & DP2)

With 11 mm of rainfall

Rainfall events of 30 July 2010 and 3 September 2010

Kargui & Baru land use areas Dongas with 27.5 et 27 mm of rainfall

Rainfall events of 20 September 2010 and 14 August 2010

Kargui & Baru land use areas Dongas with 30 mm of rainfall

Erosion

(g∙m2)

Runoff

(mm)

Erosion

(g∙m2)

Runoff

(mm)

Erosion

(g∙m2)

Runoff

(mm)

Eroion

(g∙m2)

Runoff

(mm)

Eroion

(g∙m2)

Runoff

(mm)

Eroion

(g∙m2)

Runofft

(mm)

Values of PFi

0.337ns

0.047*

0.178ns

0.204ns

0.007**

0.010*

0.025*

0.003**

0.069ns

0.220ns

0.345ns

0.166ns

Upstream Situation

-

2.41a

-

-

80.00a

4.96a

83.7a

4.50a

-

-

-

-

Centre Situation

-

4.65b

-

-

197.00b

8.53b

156.6b

8.00b

-

-

-

-

Downstream situation

-

5.24b

-

-

147.00c

7.38b

141.1b

7.43b

-

-

-

-

Average

102.6

4.10

140.00

6.2

141.00

6.96

127.3

6.64

135.00

4.55

462.00

7.4