Parameters

Plot-1

Plot-2

Plot-3

Plot-1

Plot-2

Plot-3

Boro/2022

Aman/2022

Travel speed (km/h)

3.25

3.5

4.0

3.25

3.5

4.0

Working width (m)

1.5

1.5

1.5

1.5

1.5

1.5

Total work time (min)

22.35

15.32

26.07

29.08

20.41

25.2

Delivery time (min)

1.52

1.39

2.36

2.46

1.45

2.13

Operation time (min)

21.23

14.33

24.12

27.03

19.46

23.07

Turning Time (min)

9.23

5.47

8.15

9.45

6.46

8.19

EFC (ha/h )

0.12

0.10

0.07

0.08

0.11

0.09

TFC (ha/h)

0.23

0.16

0.18

0.21

0.19

0.21

FE (%)

52.17

62.5

38.9

38.2

57.9

42.85