Continuous-process | Date | Volume (mm) | Peak flow (m3/s) | Difference | Percent difference | RMS Error (m3/s) | Volume Residual (mm) | |||||
Start | End | Sim. | Obs. | Sim. | Obs. | Volume | Qmax | Volume | Flow | |||
Calibration | 1-Sep-91 | 31-Aug-01 | 3672.5 | 4421.3 | 130.8 | 160.4 | −748.8 | −29.6 | −16.9 | −18.5 | 8.0 | −748.8 |
Validation | 1-Sep-01 | 31-Aug-11 | 4094.2 | 4775.4 | 75.8 | 293.3 | −681.2 | −217.5 | −14.3 | −74.2 | 13.4 | −700.7 |