Survey Items | n | % |
1) There is almost no possibility of delay (expected to be less than 20%). | 819 | 35.6% |
2) There is a low possibility of delay (20%). | 502 | 21.8% |
3) There is half the possibility of delay (50%). | 526 | 22.9% |
4) There is a high possibility of delay (80%) | 215 | 9.4% |
5) Expected to be late or already late (more than 80%) | 200 | 8.7% |