Survey Items

n

%

1) There is almost no possibility of delay (expected to be less than 20%).

819

35.6%

2) There is a low possibility of delay (20%).

502

21.8%

3) There is half the possibility of delay (50%).

526

22.9%

4) There is a high possibility of delay (80%)

215

9.4%

5) Expected to be late or already late (more than 80%)

200

8.7%