CRITERIA (SUB-CRITERIA)

1A[i]

2B (m)

3C[iii] (TEUs)

4D

5E[iv]

6F

7G

1A-1[ii] Number of berths

1A-2

PORTS

DOUALA

18(3)

2

7.6 m

16.500 TEUs

5

3.2 + 1.6 days

18 + days

6th

LUANDA

11(3)

5

Over 23.2 m

11.166 TEUs

1

(4 + days) + (2 + days)

12 + days

1st

APAPA

22 + (4)

6

13.5 m

Non-existent[iv]

3

1 day + 0.5 day

42 days

2nd

CONGO

11(2)

6

15.2 m

14.100 TEUs

2

2.5 days + 1.6 days

18days

8th

DRC

10(3)

8

9.1 m - 10

6000 TEUs

5

? + 2 + days

22 - 28 days

7th

GABON

3(3)

6

9 - 11 m

2500 TEUs

2

(1.5 + days) + 1 day

10 + days

5th

TEMA

14(2)

9

12.5 m

20.000 TEUs

3

1.5 days + 14.2 hours

20 + days

4th

ABIDJAN

26 + (5)

11

11.50 m

20.000 TEUs

5

1 day + 1 day

12 days

3rd