Sampling No.

Sampling area

pH

NaCl (%)

Water temperature (˚C)

No. of isolation

Gas production

YPD

YPD + 30% Sorbitol

YPD + 10% Ethanol

YPD + 20% Sorbitol and 10% Ethanol

YPD + 30% Sorbitol and 10% Ethanol

Station 1

Tama River midstream

Asa River

Mud

8.19

0.00

26.5

217

18

16

1

1

1

Station 2

Hodokubo River

Mud

8.63

0.00

27.0

100

49

46

2

1

1

Station 3

Branch Junction

Mud

8.80

0.01

25.8

165

30

28

6

4

4

Stations 1 - 3

482

97

90

9

6

6

Station 4

Tama River downstream

Rokugo Bank

Mud

6.91

0.86

23.5

80

33

24

2

0

0

Station 5

Futakotama River.1

Mud

7.36

0.01

21.2

90

32

25

9

8

8

Station 6

Futakotama River.2

Mud

7.53

0.03

25.0

20

12

8

4

0

0

Stations 4 - 6

190

77

57

15

8

8

Station 7

Tama River estuary

Anamori Inari.1

Mud

7.93

0.37

27.0

51

37

33

7

6

4

Station 8

Anamori Inari.2

Mud

7.81

0.26

28.5

87

60

56

19

18

6

Station 9

Chidori Park

Water

8.49

3.20

28.5

33

16

16

4

4

0

Stations 7 - 9

171

113

105

30

28

10

Station 10

Lake

Kasumigaura

Sakura River

Mud

7.74

0.00

21.5

64

61

61

4

3

1

Station 11

Nishiura

Mud

7.89

0.39

22.0

76

45

45

16

5

3

Station 12

Kitaura

Mud

8.81

0.02

22.0

45

19

19

9

4

3

Stations 10 - 12

185

125

125

29

12

7

Total

1028

412

377

83

54

31