Processes

WS - EL

WS - PL

TT - EL

(Sec.)

TT - PL

(Sec.)

Joining Logo part with Front part

A1

A1

14

14

Front part Lining

B1

A2

10

10

Front part Piping

B2

B2

10

10

Zipper joint with Front part

B5

A3

18

14

Side toton Stitching

B7

B1

38

14

Side toton Piping

A7

B2

10

10

Joining Side toton with Front part

A4

A4

30

10

Handle joining and Lining Front part

B8

A5

26

10

Front part Piping

B9

B6

10

14

Top part Lining

B3

B5

22

30

Top part Piping

B4

B6

10

10

U-part Lining

A2

B3

18

22

Zipper Joint with U-part

A3

B4

10

10

Top and U-part joining through zipper

A5

B7

28

18

Binding Top part

B6

B8

12

10

Looping Top part

A6

B9

10

10

Trolley cover Lining and Zipper joining

A9

A9

18

10

Handle joining with Bottom part (Gadget part)

A13

A10

62

50

Lining Bottom part

A12

A11

10

10

Two needle on Top and Bottom part

A11

B11

24

10

Handle Joining with Back part

B10

A7

50

38

Back part Lining

B11

A8

10

10

Back part Piping

B4

B9

34

14

Joining Gadget and Back part

B12

B12

50

18

Add Front part with Combined part

B13

A12

32

10

Binding

A14

A13

12

10

Cutting Excess String

A15

B13

10

10

Total time

588

406