Concrete component

Dosage at 350 kg/m3

Weight (kg)

Volume (L)

Sand of Djiri 0/0.63

525.31

332.47

G1 (crushed gravel 3.15/16)

295.44

211.03

G2 (crushed gravel 12.5/25)

1019.45

733.42

Cement: CEM II 42.5

350

Drilling water

197 L

Density of theoretical concrete

2.40 t/m3

G/S

2.50

C/E

1.78

Density of fresh concrete

2.43 t/m3