Base shear = V = ZICKSW | |
Z = Seismic zoning factor | 0.3 |
I = Importance factor | 1.25 |
T = Period | 0.09 H/B |
K = Structural system factor | 0.8 |
S = Soil factor | 1.15 |
V = Base shear | 109 ton (working load) |