Building group

Length of the pipes (m)

Size of the pipes (m)

Cost of the energy transfer stations ($)

Cost of the secondary line pipes ($)

Total cost

Private hous

3000

DN32

1,815,891

617,900

6,171,900

School and the radio office

50

DN32

31,498

63,518

95,016

Hospital

200

DN40

21,317

254,072

275,389

Offices

500

DN32

119,729

670,950

790,679

Total

7,160,440

9,148,876