Building group | Length of the pipes (m) | Size of the pipes (m) | Cost of the energy transfer stations ($) | Cost of the secondary line pipes ($) | Total cost |
Private hous | 3000 | DN32 | 1,815,891 | 617,900 | 6,171,900 |
School and the radio office | 50 | DN32 | 31,498 | 63,518 | 95,016 |
Hospital | 200 | DN40 | 21,317 | 254,072 | 275,389 |
Offices | 500 | DN32 | 119,729 | 670,950 | 790,679 |
Total |
|
|
| 7,160,440 | 9,148,876 |