Week

Peak load (MW)

AR (MW)

Error (%)

4

2830

2659.93

6.01

8

2740

2692.87

1.72

12

2530

2691.63

−6.39

16

2420

2686.27

−11.00

20

2520

2686.21

−6.60

24

2552

2684.31

−5.18

28

2690

2684.72

0.20

32

2810

2683.94

4.49

36

2900

2683.42

7.47

40

3010

2683.23

10.86

44

2540

2682.58

−5.61

48

2660

2682.15

−0.83

52

2820

2681.49

4.91

Average error (%)

8.12