Week | Peak load (MW) | AR (MW) | Error (%) |
4 | 2830 | 2659.93 | 6.01 |
8 | 2740 | 2692.87 | 1.72 |
12 | 2530 | 2691.63 | −6.39 |
16 | 2420 | 2686.27 | −11.00 |
20 | 2520 | 2686.21 | −6.60 |
24 | 2552 | 2684.31 | −5.18 |
28 | 2690 | 2684.72 | 0.20 |
32 | 2810 | 2683.94 | 4.49 |
36 | 2900 | 2683.42 | 7.47 |
40 | 3010 | 2683.23 | 10.86 |
44 | 2540 | 2682.58 | −5.61 |
48 | 2660 | 2682.15 | −0.83 |
52 | 2820 | 2681.49 | 4.91 |
Average error (%) | 8.12 |