Groups/days | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
NIM (CNI) | A | BCD | AB | A | B | A | A | A | B | A |
IM (CNI) | A | AB | A | A | AB | A | A | A | A | A |
Let.IM (CNI) | A | A | A | A | A | A | A | A | A | A |
NIM (L) | B | D | C | C | D | C | C | C | D | C |
IM (L) | A | C | B | B | C | B | B | B | C | B |
Let.IM (L) | A | BC | AB | B | C | B | B | B | C | B |