| LOCATION | ORIENTATION | REFRIGERATION LOAD | |
| TONNAGE(TONNS) | KILOWATT(KW) | ||
| IBADAN | FIRST | 47.97 | 151.45 |
| SECOND | 51.68 | 163.17 | |
| MAIDUGURI | FIRST | 52 | 164 |
| SECOND | 55.67 | 175.78 | |
| JOS | FIRST | 41.73 | 131.77 |
| SECOND | 45.43 | 143.4 | |