AADT | Initial Screening | Capacity/ LOS Analysis | Traffic Study | Context Elements | |
Level 1 | To 3: <12,000 | X |
|
| O |
To 5: <18,000 |
| ||||
(Likely Approval) |
| ||||
Level 2 | To 3: >12,000 or <20,000 | X | X |
| O |
To 5: >18,000 or <30,000 |
| ||||
(Moderate Analysis Required) |
| ||||
Level 1 | To 3: > 20,000 | X | X |
| O |
To 5: > 30,000 | X | ||||
(Significant analysis Required) |
|