b

h

Method

Step

Maximum Error

Proposed method

30

9.6015e(−17)

BHCM

34

7.48e(−17)

0.01

Adams

100

6.40e(−10)

Olabode

34

8.89e(−13)

Adesanya

25

1.75e(−14)