b | h | Method | Step | Maximum Error |
|
| Proposed method | 30 | 9.6015e(−17) |
|
| BHCM | 34 | 7.48e(−17) |
| 0.01 | Adams | 100 | 6.40e(−10) |
|
| Olabode | 34 | 8.89e(−13) |
|
| Adesanya | 25 | 1.75e(−14) |