Type

Overnight cost [$/KW]

Fuel cost [$/kWh]

Operational cost [$/year/kW]

Load factor

Life [years]

Pos-paid cost [c$/kWh]

Pre-paid cost [c$/kWh]

Advanced nuclear

5530

0.00214

93.28

0.75

60

6.61

2.37

Gas (Advanced NGCC with CCS)

2095

0.00678

31.79

0.75

30

3.40

1.95

Coal (with CCS)

4724

0.00951

66.43

0.75

30

7.02

3.73

Hydroelectric

3197

0

14.13

0.75

90

3.01

0.41

Wind Farm-Onshore

2213

0

39.55

0.35

20

7.43

4.26