stage

Product

Scheduled

product

Variation

Total

Variation

1

2

3

4

5

6

7

K

1

−0.335

−0.335

−0.335

−0.335

− 0.054

−0.054

−0.045

1

0.787

0.787

2

0.442

−0.558

−0.558

−0.558

−0.089

−0.089

−0.089

1-2

1.038

1.825

3

0.442

−0.558

−0.558

−0.558

−0.089

−0.089

−0.089

1-2-3

0.802

2.627

4

0.004

−0.004

−0.004

−1.004

−0.161

−0.161

−0.161

1-2-3-4

0.0778

2.7048

5

−0.228

−0.228

−0.228

−0.228

−0.196

−0.196

−0.196

1-2-3-4-1

0.87

3.5748

6

0.549

−0.451

−0.451

−0.451

−0.232

−0.232

−0.232

1-2-3-4-1-2

1.17

4.7448

7

0.326

0.326

−0.674

−0.674

−0.268

−0.268

−0.268

1-2-3-4-1-2-3

0.99

5.7348

8

0.103

0.103

0.103

−0.897

−0.304

?0.304

−0.304

1-2-3-4-1-2-3-4

0.320

6.0588

9

−0.121

−0.121

−0.121

?0.121

−0.339

−0.339

−0.339

1-2-3-4-1-2-3-4-5

0.726

6.7808

10

0.334

−0.344

−0.344

−0.344

0.625

−0.375

−0.375

1-2-3-4-1-2-3-4-5-6

1.368

8.1488